logo

Forgive Me

logo

Things have been very, very busy at work lately. We had our re-launch party last week so there were a ton of last minute preparations in addition to all the day to day stuff. So in conjunction with that and making visits to the house (and a LOT of LA traffic) I’ve had not a lot of time for our little bloggy blog. My sincerest apologies to our faithful followers.

You all know how fast Ken works by now so I don’t even know where to begin. I’m afraid I can’t get in to the whole “day by day report” thing here so I’ll just post some pictures to supplement the list below.

1. Granite countertops and tile backsplashes have been installed in the kitchen.

2. Master bathroom is 90% complete.

3. House has been sprayed for bugs.

4. Existing bath/ new powder bath has been demo’d.

5. Exterior is 90% painted.

6 Responses to “Forgive Me”

  1. Susie says:

    Yay for another update! I know you’re busy, but love the sneak peeks!

    Love the master bath tile floor. Great choice. The kitchen sink is the bomb! And the awning is so much bigger once it’s laid out in your living room next to Ken, who isn’t the smallest person I know.

    Way cool. Great to see the progress.

  2. Kim says:

    Your kitchen sink makes me want to do dishes, and your shower is inspiring me to go take one right now.

  3. Laura Dean says:

    Yaayyy! Another update. Withdrawal symptoms be gone!

  4. Becky says:

    In China, the travel bar was directly below the shower head. What’s the deal? BTW, I’ve got a pic of Kohler in Beijing.

  5. Janet Waters says:

    The sink and countertops are to die for!!

  6. Amber B. says:

    That kitchen is a dream!

Leave a Reply

logo
logo
Powered by
Powered By Cuadra Development